MUNICIPAL PROJECT
Shield completed an analysis to determine the extent of slope erosion resulting from stormwater velocity and soil conditions. To restore and stabilize the bank, Shield designed a SCOURLOK wall with an ARMORMAX erosion control system. The project also involved placing select fill and backfill along approximately 325LF of the bank.
Located near a fire station and public recreation facilities, this project was essential for maintaining community safety.
- Location: Hurst, TX
- Project Dates: 2023 – 2024
- Client: The City of Hurst
- Size: Approximately 325LF of Stream Bank
- Services Included: Floodplain Management, Drainage, Grading & HEC-HMS Modeling
ABOUT
Located in North Texas, Shield offers full engineering and production capabilities, including preparation of plans, specifications and cost estimates.
CONTACT
Fort Worth Office
1600 West 7th Street
Suite 400
Fort Worth, TX 76102
Dallas Office
17311 North Dallas Parkway
Suite 210
Dallas, TX 75248
817.810.0696
info@shield-engineering.com
TBPELS Engineering #F-11039 & Surveying #10193890
















